Departments & assignees
Departments determine how action items are grouped and who receives notifications. Configure them in Settings → Departments.
Default departments
Section titled “Default departments”Redline comes with six standard departments:
- Engineering — BOM updates, design changes
- Procurement — PO cancellations, amendments, new orders
- Production — Production order updates, manufacturing BOM reviews
- Assembly — Assembly-level changes
- Quality — Inspection and verification tasks
- Service — Field change orders, customer notifications
You can rename these or add custom departments to match your organisation.
Default assignees
Section titled “Default assignees”Each department has a default assignee — the person who receives action items when no specific user is assigned. Set this in Settings → Departments → Default assignees.
When an action list is generated, each action is automatically routed to the default assignee for its department. You can override the assignee on individual action items before releasing the ECO.
Contacts
Section titled “Contacts”For departments where the assignee is not a Redline user (e.g., an external supplier contact or a production floor lead who only uses email), add them as contacts. Contacts receive email notifications but do not need a Redline login.
Escalation thresholds
Section titled “Escalation thresholds”Configure how quickly Redline escalates overdue actions:
| Setting | Default | Purpose |
|---|---|---|
n2_reminder_delay_hours | 48 hours | Time before first reminder email |
escalation_level2_days | Configurable | Days until Level 2 escalation (coordinator + department head notified) |
escalation_level3_days | Configurable | Days until Level 3 escalation (operations director notified) |
See Notifications & follow-up for the full escalation flow.
Other configurable thresholds
Section titled “Other configurable thresholds”| Setting | Purpose |
|---|---|
phase_in_buffer_days | Safety margin added to calculated phase-in dates (default: 5 days) |
erp_staleness_threshold_hours | When ERP data is considered too old for calculation |
verification_step_required | Whether ECOs require a verification step before closing |
ccb_required_for_minor | Whether minor changes require CCB approval |